The depth of the finished bore about 6.81" with about 1/8" to 3/16" of relief before the domed head. From the edge of the spigot to the top of the dome head is about 7.4".
aug29cyl.jpg
aug29cyl.jpg
Only registered users may post new messages on this forum. You must be an AMCA member to register. Click the register link on the top right to proceed.
If this is your first visit, be sure to check out the FAQ by clicking the link above. To start viewing messages, select the forum that you want to visit from the selection below.
If you are NOT an AMCA Member and would like to join Click Here
Comment