
I left the shop around 9 last night, and my dad and ryan worked until midnight beating dents out of the gas tank. It turned out really well considering what it looked like.

The shift gate area was really beat in and battered. You can not fill this area in with bondo since the shift gate bolts to it.

I bolted in the straightening rod to keep everything in place while we beat the shift gate area out from the inside of the tank.

Ryan ran the hammer and punch, and I held the tank over a piece of wood, and this is the result. It came out really well. More updates to follow! We just got our 7/8 tubing for the frame, so we can jump back on that project.





























Leave a comment: