I was having problems with loading the pics of Ryan's basket case onto my photobucket account, so I just put the pic up on my blog. Here is a link to it http://oldbikesinsd.blogspot.com/2009/10/free-wla.html.
We only have two months to get things done, so it will be a whirlwind deal. luckily the two months will be spread out over the next ten months. Our goal is to get the rolling chassis, transmission and sheet metal done during Ryan's christmas break. Then in March Ryan will rebuild the motor at Dale's Wheels through time museum. And if everything goes right, we will do final assembly of the bike sometime in the summer. I will do updates on this site along with a couple others as soon as the work begins.
We only have two months to get things done, so it will be a whirlwind deal. luckily the two months will be spread out over the next ten months. Our goal is to get the rolling chassis, transmission and sheet metal done during Ryan's christmas break. Then in March Ryan will rebuild the motor at Dale's Wheels through time museum. And if everything goes right, we will do final assembly of the bike sometime in the summer. I will do updates on this site along with a couple others as soon as the work begins.
Comment